Step 1

The ground is marked with spray paint or a string line. A small sod cutter is used to remove the grass around the existing beds. This will not disturb existing beds

Step 2

All concrete is mixed onsite using a small mixer and trailer. There is no heavy equipment or concrete trucks on your property.

Step 3

The concrete is fed from a wheel barrow into the small extruding machine. This creates a continuous piece of concrete curb.

Step 4

The curb is smooth finished with a hand trowel, or textured using our special stamping tools.

Step 5

Control/Expansion joints are cut every 3 feet while the concrete is still wet. The cuts are approximately 40% into the curb.